Newark Liberty Airport Canopy

In 2019, Newark Liberty Airport hosted more than 46 million passengers; however, the busiest terminal in the airport, Terminal A, was outdated and in need of renovation. In September 2021, the airport began a renovation to update Terminal A with 33 gates – 20% larger than the prior terminal.
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 700 tons | HDG: 700 tons

Components

Structural columns and roof girders constructing 300 feet of pedestrian canopy

In 2019, Newark Liberty Airport hosted more than 46 million passengers; however, the busiest terminal in the airport, Terminal A, was outdated and in need of renovation. In September 2021, the airport began a renovation to update Terminal A with 33 gates – 20% larger than the prior terminal. The newly updated terminal will offer more traffic lanes at drop-off and pick-up points, closer check-in counters and security areas, and more gate flexibility to allow planes to park at any gate.

These upgrades are not only vital for maintaining modern day amenities, but also because the previous 50-year-old terminal was deteriorating. The two canopies for Terminal A were hot-dip galvanized and painted, to create modern looking, spacious pedestrian canopies, which are a beautiful duplex system. There was much communication between the galvanizer, fabricators, painter, and general contractor.

Many of the pieces were intricate shapes and sizes and required extra attention to design proper ventilation. Due to the intricate shape of some of the plate girders, loading for shipment was a concern to uphold proper quality of the paint finish. After galvanizing was complete, the galvanizer, painter, and fabricator communicated on every load to complete a true team effort and a pristine duplex finish.

The Canopy is often the first impression passengers have of the “new” Terminal A at Newark Liberty Airport. Thanks to the durability of the hot-dip galvanized steel and added aesthetic of the duplex coating, the canopy will provide a warm welcome to air travels well into the future.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Great Dane

Certainly not one of the first to start using Hot-Dip Galvanizing, but maybe the most visible. As one of the largest in the Semi-Tractor/Trailer Manufacturing industry, Great Dane is another who has teamed with Hot Dip Galvanizing, for lasting corrosion protection for their trailer frames.

Harrah's Resort Atlantic City Parking Garage Solar Canopies

Caeser Entertainment is committed to renewable and suitable energy. Caeser Entertainment is propelling toward it’s goal of reducing greenhouse emissions by 100% before 2050.

Ridge Avenue World War One Memorial Bridge

This project was publically funded and a controversial expense for the County. The DOT agreed to the Bridge, however the County wanted it to be a Memorial, to replace the World War I "Artillery Bridge" that had been close and removed years earlier.

ProSeries Mast Climber

Premier Scaffold Solutions reinvented the mobile scaffold industry in 2009 with their ProSeries Mast Climber. The ProSeries Mast climber makes it easier to replace aging mast climbers, because of its modular bridging being compatible with other mast climbers on the market.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel