Quicken Loans Arena Rooftop LED Sign

The timeline for this project was unique as the rooftop structure was being constructed during the current NBA season. The project had to be completed by the time of the NBA playoffs (started in May) and in time to host the Republican National Convention in June.

Date

Location

Cleveland, OH
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 150 tons | HDG: 150 tons

Components

100% of the structural steel to support the massive LED Sign Structure.

The timeline for this project was unique as the rooftop structure was being constructed during the current NBA season. The project had to be completed by the time of the NBA playoffs (started in May) and in time to host the Republican National Convention in June. Both of these high profile events forced the construction team, the fabricator, and the galvanizer to communicate and strategically plan how to pull these demands (directly from the owner) off in time for the maximum national exposure they were seeking.

The owner of the arena was looking for a strong, durable, corrosion resistant, design that would not cost much to maintain in the future. With the recommendation and previous successful experiences of the design firm, WJHW, it was concluded that hot dip galvanized structural steel was the solution to getting the project done within budget and on time. finished sign during the day structural installation phots Installation Photos all steel installed before sign is afixed

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Old Dominick Distillery

Old Dominick Distillery is a maker of Bourbon founded in Italy. Founded 150 years ago by Dominick Canale the Bourbon is still family owned and operated.

Cedarville Ship Loader

This structure was built to load limestone onto freighters on the Great Lakes. This 125 long piece of equipment makes up 250 tons of steel.

Bridge Port I

BridgePort I's 243,600 square foot distribution center on a remediated 60-acre site required 25 tons of hot-dip galvanized steel for rooftop access systems, with proximity to the galvanizing facility enabling direct delivery of large sections for seamless installation.

Himalayan Kedarnath Temple Pilgrimage Bridge

The previous Bridge was washed out by flooding, in 2013. This resulted in over 5700 people dead or missing.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel