Chicago Ave. Bridge

U.S. Bridge’s mission is to connect communities one steel bridge at a time.
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 296 tons | HDG: 296 tons

Components

27 seven floor beams, 10 truss sections weighing 102,200 pounds each, 5,350 shop bolts, 4,570 field bolts for a grand total of 592,000 pounds of hot-dip galvanized steel.

U.S. Bridge’s mission is to connect communities one steel bridge at a time. Therefore, when the city of Chicago needed an interim bridge to replace the Chicago Avenue bridge, U.S.

Bridge stepped up to the plate. The Chicago Avenue bridge was built in 1914 and its central location in Downtown Chicago makes it an important corridor that carries 20,000 vehicles and over 20,700 passengers on CTA buses. The project consisted of the demolition of the existing bridge and the construction of the new structure within a 3-month period.

This was an important project that provided the City of Chicago with a solution to continue the traffic flow of this busy area in downtown. The high profile Chicago Avenue bridge project required both a durable coating and corrosion proof solution for its owner, as well as the residents and commuters of downtown Chicago. A durable coating was needed in order to install a turn key bridge solution within a matter of months without concern to the integrity of the coating system of the structure.

The speed of installation and the hassle-free characteristics of the zinc coating meant everything to the timeline of the project. Hot-dip galvanizing gave the fabricator, erector and contractor the flexibility to deliver and install the bridge expeditiously, without having to worry about damage to the coating or how it might look in the very populated area. While the temporary bridge calls downtown Chicago home, there will be no maintenance required to the bridge coating whether it sits for months or for decades to come.

Aesthetically, the bridge blends into the bustling environment without the threat of unsightly corrosion in the months or years to come. The Chicago Avenue bridge is intended to be only a temporary bridge, however thanks to hot-dip galvanizing, the City of Chicago has the option to keep it in service for as long as it desires.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

UMB Maintenance Bay

The University of Maryland School of Medicine's Bresler Research Center added a hot-dip galvanized rooftop maintenance bay with overhead crane system for servicing HVAC equipment on the 15-story building.

SQ Balefeeders

Modular large square bale feeders were developed for 3x3x8 bales, utilizing hot-dip galvanizing for ultimate corrosion protection in livestock operations serving up to 45 adult sheep or goats per feeder. The component-based design enables flat freight shipping and flexible on-site assembly into 10 or 15-foot configurations for various farm operations.

I-480 Valley View Bridge Catwalk

The $228 million I-480 Valley View Bridge / Design-Build is the largest active project in the State of Ohio and the 4th largest in ODOT history. ODOT engineers came up with a plan to turn 2 bridges into 3 bridges.

Frederick MD Carroll Creek Park

A desolate Carroll Creek in Fredrick, Maryland was selected as a site to be renovated and make more available for the community. They insisted that the area be as sustainable as possible.