Chicago Ave. Bridge

U.S. Bridge’s mission is to connect communities one steel bridge at a time.
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 296 tons | HDG: 296 tons

Components

27 seven floor beams, 10 truss sections weighing 102,200 pounds each, 5,350 shop bolts, 4,570 field bolts for a grand total of 592,000 pounds of hot-dip galvanized steel.

U.S. Bridge’s mission is to connect communities one steel bridge at a time. Therefore, when the city of Chicago needed an interim bridge to replace the Chicago Avenue bridge, U.S.

Bridge stepped up to the plate. The Chicago Avenue bridge was built in 1914 and its central location in Downtown Chicago makes it an important corridor that carries 20,000 vehicles and over 20,700 passengers on CTA buses. The project consisted of the demolition of the existing bridge and the construction of the new structure within a 3-month period.

This was an important project that provided the City of Chicago with a solution to continue the traffic flow of this busy area in downtown. The high profile Chicago Avenue bridge project required both a durable coating and corrosion proof solution for its owner, as well as the residents and commuters of downtown Chicago. A durable coating was needed in order to install a turn key bridge solution within a matter of months without concern to the integrity of the coating system of the structure.

The speed of installation and the hassle-free characteristics of the zinc coating meant everything to the timeline of the project. Hot-dip galvanizing gave the fabricator, erector and contractor the flexibility to deliver and install the bridge expeditiously, without having to worry about damage to the coating or how it might look in the very populated area. While the temporary bridge calls downtown Chicago home, there will be no maintenance required to the bridge coating whether it sits for months or for decades to come.

Aesthetically, the bridge blends into the bustling environment without the threat of unsightly corrosion in the months or years to come. The Chicago Avenue bridge is intended to be only a temporary bridge, however thanks to hot-dip galvanizing, the City of Chicago has the option to keep it in service for as long as it desires.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Stevens Residence

The rope design of the railings was fabricated for the Stevens Residence in Ocean City, NJ and is constantly exposed to the salt air. The fabricators' previous experience with galvanizing led them to insist that the steel be hot-dip galvanized to protect it from the aggressive environment.

Trash Receptacles

The owners loved the "look" of hot dip galvanizing and the corrosion protection they saw as a plus.

Lowell Bridge

All of the connecting plates and angles were galvanized. The rest of bridge was blasted and painted, as the structure was too large to galvanize.

Manac Trailers

Manac Trailer is a leader in the specialized trailer market, and is dedicated to staying up-to-date with the latest technologies that can be applied to their products. Hot-dip galvanizing has long been an option that Manac Trailer has been willing to provide their customers.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel