Rio Rinassico Gorge Bridge

The Val di Non is known for natural beauty, architecture and apples. When a precast concrete bridge was damaged by a slow moving landslide on a steep side of the gorge, it was closed and removed.
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 107 tons | HDG: 107 tons

Components

Trusses/Transoms/Decking/Raker Braces/Sway Braces

The Val di Non is known for natural beauty, architecture and apples. When a precast concrete bridge was damaged by a slow moving landslide on a steep side of the gorge, it was closed and removed. Without another route to keep the small towns in the region connected, the bridge across the gorge is vital to the region’s economy, which is reliant on tourism and agriculture.

Acrow supplied a modular steel bridge to enable access over the Rio Rinassico Gorge in the Province of Trento in northern Italy while a new bridge is built. This long term temporary bridge has a length of 67 meters in 3 continuous spans and a width of 3.67 meters. The epoxy aggregate deck surface and design load of 44mt truck complies with Eurocode design standards.

After extensive site preparation including the installation of micropiles to provide stabilization to the bank of the south slope of the gorge, the assembled Acrow bridge was lifted in two segments onto the bearings with a crane and installed in just six days. It is expected that the long-term temporary bridge will remain in place until a new bridge is completed, which is expected to take several years.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Mount Olive Solar

Mount Olive, NJ is home to the largest landfill solar project in North America. The Mount Olive property served as a landfill from 1966 to 1981.

Davidson County Airport Runway Gantry

A new approach lighting system was installed at the Davidson County Airport will be a first of its kind in North Carolina, crossing a major interstate.

Goodale Street Parking Garage

The new Goodale Parking Garage was installed to meet increased demand for parking near the Convention Center and Short North District. The parking facility was constructed on the side of an old surface lot which accommodated 192 cars.

Purina Nestle Cooper Steel Green Acres

Nestlé Purina’s $550M pet food facility in Batavia, OH—its first new factory since 1975—will create 300 jobs and feature advanced robotics. Cooper Steel and the galvanizer partnered to deliver over 3,500 tons of steel across 150+ truckloads on a fast-track timeline, ensuring on-time delivery for this massive 1.2M sq ft project.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel