CHOP Hub for Clinical Collaboration

The CHOP Hub for Clinical Collaboration at 3501 Civic Center Boulevard, is the newest addition to the Children’s Hospital of Philadelphia complex in University City, West Philadelphia. Designed by Perkins+Will, the building stands 377 feet tall, with 19 high-ceiled floors.

Date

Location

Philadelphia, PA
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 555 tons | HDG: 555 tons

Components

Tubing, Beams, and Angle for rooftop mechanical units and screen wall

The CHOP Hub for Clinical Collaboration at 3501 Civic Center Boulevard, is the newest addition to the Children’s Hospital of Philadelphia complex in University City, West Philadelphia. Designed by Perkins+Will, the building stands 377 feet tall, with 19 high-ceiled floors. The modern structure will add over 550,000 square feet of space and 560 new beds for future patients.

The steel used in The HUB for Clinical Collaboration expansion was fabricated in the Virginia and New Jersey plants of Banker Steel Company. The company fabricated and erected 9,000 tons of structural steel for Turner Construction on the project. The top floors of the The HUB for Clinical Collaboration is where you will find more than 550 tons of hot-dip galvanized steel members.

This includes the enclosures for the rooftop mechanical equipment and a two story high screen wall. Hot-dip galvanizing was chosen for the corrosion performance and the longevity of the coating. Over the course of time this will minimize preventative maintenance and allow the steel framing to last for decades to come.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Deed's Point Pedestrian Bridge

The new bridge replaces a structure that rusted from the inside and was shut down a couple of years ago and removed because it was deemed unsafe. The new bridge is expected to last about 75 years ― or about 5 times longer than the structure it replaces, officials said.

Vale Nickel Plant

Sustainable products have more of an impact in Canada than they presently do in the United States. The environmentalists in Canada have kept a close eye on the Vale Nickel Plant, so using sustainable material in the project was a high priority.

Saf-T-Cart

When it comes to transporting gas cylinders for medical, industrial and commercial use, Saf-T-Cart is the leader of the industry. Saf-T-Cart manufactures cylinder carts, cages, pallets, truck beds, and trailers for an extensive range of applications.

Kreider Farms

The corrosion protection of the steel was the main reason for hot-dip galvanizing. The economics and the time that the steel could be finished was probably the most influential selling point to use all galvanized material on this project.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel