Poultry Farm Bucket Elevator

This massive galvanized bucket elevator system supplies over 350 tons of poultry feed per hour up 198’ trunk sections with a 100 horsepower gear drive. This system operates 24 hours per day, 6 days per week, and longevity of the steel is essential.

Date

Location

Rose Hill, NC

Industry

Agriculture
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 22 tons | HDG: 22 tons

Components

This massive galvanized bucket elevator system supplies over 350 tons of poultry feed per hour up 198’ trunk sections with a 100 horsepower gear drive. This system operates 24 hours per day, 6 days per week, and longevity of the steel is essential.

This massive galvanized bucket elevator system supplies over 350 tons of poultry feed per hour up 198’ trunk sections with a 100 horsepower gear drive. This system operates 24 hours per day, 6 days per week, and longevity of the steel is essential. This poultry farm in Rose Hill, NC was looking to add a bucket elevator to its essential feed production process.

The project features several bucket elevators and a structural platform at the top of the 198’ mill. When choosing the coating for this system, the owner chose hot-dip galvanizing because of its resistance to the moisture of the materials inside of the machine that would cause undetected corrosion. Hot-dip galvanizing was chosen over other options because of its longevity, competitive price, and its pliability.

The boot section is where the product enters the system, and is made of 3’8” plates. The product then feeds up the trunk sections via belts and buckets, then return back down. Because the belts and buckets cannot touch the sides of the trunking, due to wear and spark potential, careful consideration was taken when designing the elevator system.

If the design caused too much distortion, this will present a problem for the system and will greatly reduce longevity. The galvanizer took precautions to dip these with no room for error; communication between the galvanizer and manufacturer was key, due to these potential issues.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Amanda Clearcreek ACES

$22 million Amanda-Clearcreek Local Schools District Improvement Project including a 30000 sq ft field house and campus athletic enhancements.

The Rastin Observation Tower

Mount Vernon is the county seat of Knox County, located in North Central Ohio, and is home to the brand new Ariel-Foundation Park, a 250-acre public green space built on the site of the former Pittsburgh Plate Glass (PPG) manufacturing plant (which closed in the 1970s).

Holy Spirit High School

21-foot structural steel archway entrance for Holy Spirit High School's athletic complex featuring a duplex galvanize-and-paint finish for coastal New Jersey.

City of Utuado Bridges (After Hurricane Maria)

In September of 2017, Hurricane Maria, a category 5 storm, brought devastation to the island of Puerto Rico. Maria left the country without power and more than 1,100 lives were lost to this catastrophic event.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel