Hunter Truck Lift

Hunter’s Heavy-Duty Four-Post semi and truck lift features a 35,000-lb. lifting capacity and 300-in. alignment wheelbase capability. The hot-dip galvanized runways offer the best in corrosion protection for your investment.

Date

Location

Durant, MS
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 3 tons | HDG: 3 tons

Components

Semi Truck Lift Ramps

Hunter’s Heavy-Duty Four-Post semi and truck lift features a 35,000-lb. lifting capacity and 300-in. alignment wheelbase capability. The hot-dip galvanized runways offer the best in corrosion protection for your investment. The lift comes alignment ready with turn plate pockets and slip plates for servicing standard vehicles.

It can be equipped with optional Power slide and FIA turn plates and slip plates saving time by eliminating trips around the truck when locking and unlocking plates. The aligner can be connected to control all lock and unlock functions automatically. Originally the semi ramps used on the semi truck lifts were painted.

When Hunter Engineering decided to hot-dip galvanize the ramps it took several meetings with the galvanizer and close review of AGA design materials to make the ramps suitable for hot-dip galvanizing. Ramps up to 30”x27’0”’ are now being galvanized.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Bus rapid transit station featuring hot-dip galvanized and painted tube steel construction along East Washington Avenue

Madison Bus BRT Shelter

Madison's bus rapid transit system Phase 1 features 45 stations with hot-dip galvanized and painted tube steel construction, requiring close fabricator-galvanizer coordination for proper vent and drain placement on architecturally exposed structural steel elements. The duplex coating system delivers both required corrosion protection and desired aesthetic color for the transit infrastructure.

Richards Brothers Farms

This high-profile greenfield grain bin project in El Campo, TX features two grain loop systems with a total of 9 grain storage bins and 1 load-out hopper tank.

Riviere Cochon Gras Bridge

There’s an old saying, “one person’s trash is another person’s treasure.” In the case of the Riviere Cochon Gras Bridge, that saying became reality.

Pulaski Skyway Railing

The Pulaski Skyway was originally built in 1932, linking the cities of Newark, NJ and Jersey City, NJ, while passing over the Meadowlands. It is a 3.5-mile-long steel structure, with two main river-crossing spans of 550 feet in length.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel