The design, approval, fabrication, and erection of the fabulous Fore River Bridge was an arduous five-year process. Designed uniquely for this site, the Acrow Corporation is one of the few companies that have lift-bridge design experience, making the Fore River Bridge an awesome reality.
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

HDG: 8000

Components

Bolts, fasteners, and all structural components.

The design, approval, fabrication, and erection of the fabulous Fore River Bridge was an arduous five-year process. Designed uniquely for this site, the Acrow Corporation is one of the few companies that have lift-bridge design experience, making the Fore River Bridge an awesome reality. Acrow chose hot-dip galvanizing to protect the 8,000 tons of structural steel components and fasteners because of its longevity, consistent appearance over many decades, and virtually maintenance-free lifetime.

The schedule required three galvanizing companies to supply the durable zinc coating to the structural steel. Working as a team, the three even hand-dipped custom-made components that required special care. Integrated into the design are marvels of electrical and mechanical engineering, working in harmony with the moving steel pieces protected by hot-dip galvanizing.

This truly majestic structure is a key element of the 3H highway connecting Boston and Cape Cod, Massachusetts, and will proudly serve for generations.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Maybrook Solar

8-megawatt fixed-tilt solar installation on approximately 45 acres near Poughkeepsie NY engineered to resist 160 mph winds and heavy snow loads.

OSU Wexner Medical Center Inpatient Hospital

OSU Wexner Medical Center's $1.9 billion inpatient hospital tower utilized hot-dip galvanized steel for mechanical floors 7-10, including HVAC louvre support and curtain wall systems housing equipment at the top of Ohio State University's largest capital project in history.

Rich Street Bridge

The consulting engineer for the Rich Street Bridge was looking for a coating system that would stand the test of time against high vehicle and pedestrian traffic in busy downtown Columbus.

Methodist Columbarium Sculpture

While visiting the Metals Museum we learned of the opportunity of a local church trying to raise funds for this beautiful Sculpture. We immediately asked where we could help.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel