Morgan State University Pedestrian Bridge
The School needed a Maintenance free structural pedestrian bridge that could be erected before the fall semester started. Galvanized Steel was the only coating system they felt would not hinder their schedule.

Description
The Challenge, The Solution, The Results
The School needed a Maintenance free structural pedestrian bridge that could be erected before the fall semester started. Galvanized Steel was the only coating system they felt would not hinder their schedule. Morgan State University Pedestrian Bridge Morgan State University Pedestrian Bridge Morgan State University Pedestrian Bridge
Our Portfolio
Protecting America's Infrastructure One Dip at a Time

Detroit Bio Solids
The project originally only had 250 tons to be galvanized with the rest of the steel receiving a 3 coat paint system. After working with DOC with the assistance of Bill at Art Iron the project was converted to 100% galvanized steel.

Eaton County Building Solar Canopy
Eaton County is looking to go green at the courthouse and other buildings. County commissioners believe updating the energy efficiency at the county buildings will save the county thousands of dollars, which is money that can be spent on other things in the community.

Pyrmont Road Bridge Rehab
Built in 1904, this bridge is a beautiful nine-panel pin-connected Camelback truss bridge. Pin-connected Camelback truss bridges are uncommon, far less common than Parker trusses of their time.

Southport Marina
Southport Marina joined a growing national trend in building a dry stack boat storage system. The 50’ high building has capacity for 120 boats for winter storage.
Ready to Transform Your Project with Industry-Leading Galvanizing?
Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.


