Worly Building Renovation

The historic Worly Building nestled in the Brewery District within Columbus, Ohio, was recently renovated to be used for a mixed use retail property.

Date

Location

Columbus, OH
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 20 tons | HDG: 20 tons

Components

All exposed steel including the handrails, canopies, and sign structures.

The historic Worly Building nestled in the Brewery District within Columbus, Ohio, was recently renovated to be used for a mixed use retail property. The building, which was once used a horse stable for the attached brewery, is now the home of World of Beer and The Shadowbox Cabaret, a live mixed-use theatre. The local Brewery District commission initially demanded the exposed steel be painted black in order to conform to the area's uniform code of building appearance.

The architect came up with the idea to hot-dip galvanize the exposed steel to provide an "industrial appearance" to the outside of the building. The architect had also seen how some of the area's surrounding steel was rusting within a few years of renovation. After having to appeal to the local commission, the building was ultimately allowed to leave the exposed steel galvanized, without the paint.

With more renovations underway in the surrounding area, the exposed galvanized steel has caught traction with other building owners and architects.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Quincy Parking Garage

When constructing this precast concrete garage at the entrance of the seven story office building, the designers wanted to emphasize the adjacent courtyard and hide the cars from view.

Gaysport Bridge

The Gaysport Bridge in southern Muskingum County has had four bridges at this location: the first bridge was a wooden covered structure erected in 1887 which lasted one year. The second bridge was a steel bridge which was built in 1899 and lasted until the 1913 flood.

Philly Live

Hot-dip galvanizing was selected for the coating durability and initial life-cycle cost. The job cost may be slightly higher initially, but due to the longevity of the coating, this wil cut down on the maintenance and up-keep of the project, therefore lowering the overall costs of the project.

Fairport Lift Bridge

The Fairport Lift Bridge was originally constructed in 1913-1914. Restoration of the historic bridge took nearly two years, in July of 2021, the bridge was reopened to traffic.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel