The Veterans Glass City Skyway Bridge Railing

The Veterans Glass City Skyway Bridge is A Cable-Stayed bridge that crosses over the Maumee River in Toledo, Ohio. Until it transfers over to local control, the bridge is owned by the Ohio Department of Transportation (ODOT).
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 200 tons | HDG: 200 tons

Components

Tube and beam posts

The Veterans Glass City Skyway Bridge is A Cable-Stayed bridge that crosses over the Maumee River in Toledo, Ohio. Until it transfers over to local control, the bridge is owned by the Ohio Department of Transportation (ODOT). The skyway is ODOT’s largest single construction project ever.

After many delays the bridge opened in 2007. During the original construction all the original bridge railing were painted and after 13 years of service, the rail had corroded to the point that it was no longer safe. In 2020 the decision was made to replace the railing with a duplex coating consisting of hot-dip galvanizing and polyurethane paint per Ohio Department of Transportation specifications.

In close partnership with Cox Brothers Machining, logistics and communication were key on this project. The galvanizer managed all phases of this project which included transportation and logistics of all material to and from galvanizer, painter and job site, to maintain the schedule requested by the customer. Management of the job included identifying/planning for lane closures, frost laws, traffic management, and coordination with Kokosing (the Installer on site).

Kettle tags were used prior to galvanizing for identification, as each load was required to be delivered in the same order in which it was received. In the spring of 2021 part of the East and West bound lanes were closed and the old railing was dismantled. In November of 2021 all of the railing had been replaced and the bridge was officially reopened.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

New York City WiFi Stations

The durability of the HDG coating in a city like New York. The Architect said he wanted a coating that was "public proof".

Fenway Park Right Field Stands

Over 3 million people a year eat, cry, stomp, and spill beer on the stands at Fenway Park. Combine that with the pressure of matching the historic Fenway Park green and a tight between-season deadline, and a duplex system utilizing hot-dip galvanized steel was the best way to fulfill these needs.

Methodist Columbarium Sculpture

While visiting the Metals Museum we learned of the opportunity of a local church trying to raise funds for this beautiful Sculpture. We immediately asked where we could help.

McDonald's Solar Canopy

There was only one logical option for protecting the steel on this project: hot-dip galvanizing. Lake effect snow and road salts are only a few of the things the McDonalds Solar Canopy will be exposed to over the years.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel