The Pine Mountain Ski Jump

The Pine Mountain Ski Jump, originally built in 1937, is one of the highest artificially created ski jumps in the world, located in Iron Mountain, Michigan, Dickinson County. It is part of the Kiwanis Ski Club and hosts annual FIS Ski Jumping Continental Cup competitions.

Date

Location

Iron Mountain, MI
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 400 tons | HDG: 400 tons

Components

Ski jump tower, scaffolding, handrail and stairs

The Pine Mountain Ski Jump, originally built in 1937, is one of the highest artificially created ski jumps in the world, located in Iron Mountain, Michigan, Dickinson County. It is part of the Kiwanis Ski Club and hosts annual FIS Ski Jumping Continental Cup competitions. The original wood structure was fully replaced with a hot-dip galvanized steel structure.

The renovation of the 176 foot tall Pine Mountain Ski Jump was created to ensure that the facility in Michigan will continue to meet the criteria required by the International Ski Federation FIS. The new, larger structure will also now allow the jump to host the World Cup jump event. Annually in February, it hosts jumpers from around the world at the best tournament in the United States.

Currently Pine Mountain holds the U.S. records for the longest jump in World Cup competition at 459 feet, as well as the overall distance record at 472.44 feet. The owners and design team wanted a reliable coating that would be maintenance free for them in the years to come. They also wanted a consistent color and a durable coating on every single piece of steel.

Their ultimate goal was to make the structure maintenance free to ease the burden on the volunteers of the Kiwanis Ski Club. Several ideas were thrown out in terms of construction materials and coatings. They turned to hot-dip galvanizing to meet their ultimate needs.

The jump is planning to host the 2022 World Cup Ski Jump Event. The momentous event will allow both Iron Mountain and hot-dip galvanizing to be put on the map in the ski jump industry now and into the future. original jump in 1937 new jump at night ready to roll during erection

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

One Vanderbilt

Developer SL Green announced that One Vanderbilt, the enormous office tower rising next to Grand Central Terminal, has now topped out.

JPMorgan Chase 270 Park Ave

JPMorgan Chase's 60-story, 2.5 million square foot headquarters at 270 Park Avenue utilized 1,500 tons of hot-dip galvanized steel for upper floors to combat corrosive conditions from heat and moisture generated by electrical equipment. This $3 billion supertall structure is the tallest building in New York completely powered by hydroelectric energy.

Lite-Site Quick Deploy Cell Units

CDMI developed and patented the Lite-Site as a portable, standardized, self-contained wireless cell site. The Lite-Site has been used in various communication and non-communication applications where deployment is difficult and time sensitive.

Pinecrest I74 Bridge

The Pinecrest I-74 Bridge replacement features a 214-foot, two-span structure with hot-dip galvanized composite plate girders supporting cast-in-place concrete decking, designed to eliminate low clearance safety issues from the original 1959 bridge. IDOT specified galvanizing for its proven longevity value in bridge infrastructure, with staged construction maintaining traffic flow during replacement.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel