Fairport Lift Bridge

The Challenge, The Solution, The Results
The Fairport Lift Bridge was originally constructed in 1913-1914. Restoration of the historic bridge took nearly two years, in July of 2021, the bridge was reopened to traffic. The 114 year old bridge is composed of machinery unique to its rich history.
When built, the traffic from cargo ships was much heavier than that of vehicular traffic, as such- the bridge remained in the upright position until a vehicle came to cross and required it be lowered. Now that there is much heavier vehicular traffic than cargo, the opposite positioning of the bridge can be found. The bridge was originally set to open in 2020 but faced complications and delays related to supply chain issues during the coronavirus pandemic.
This historic bridge restoration required the fabrication and hot-dip galvanizing of 77 Tons of steel and took 22 months to complete. The total weight of this bridge is about 345 tons and is lifted by the power of a 40 horsepower motor. Hot-dip galvanizing was chosen for this bridge due to coating durability and long lifetime cycle.
This bridge is expected to continue to hold an interest with both historians and future generations who will utilize it. Each end of the bridge also has a staircase so that pedestrians can cross the bridge when it is raised.
Protecting America's Infrastructure One Dip at a Time

Logan Park

Wells Ice Cream

Mayflower II Restoration

Penn State Health Lancaster Medical Center
Ready to Transform Your Project with Industry-Leading Galvanizing?
Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.