Hollywood Casino, Columbus

During a visit with the Marnell Las Vegas office, the design team was exploring options for both the screen wall design and the HVAC chiller unit structure, attached to the Casino.

Date

Location

Columbus, OH
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 2500 tons | HDG: 300 tons

Components

The structural steel supporting the screen wall on both the chiller building and parking garages. The structural steel for the main structure of the chiller building.

During a visit with the Marnell Las Vegas office, the design team was exploring options for both the screen wall design and the HVAC chiller unit structure, attached to the Casino. They were concerned about the likelihood of corrosion of the exposed structural steel, especially in a harsh Midwest climate. They wanted a product that would last for a lifetime, and require no maintenance.

They made it clear that downtime for maintenance, including having to repaint or touch up structural steel is not tolerated in the Casino industry. In the high revenue nature of the Casino business, interruptions can end up costing its owner hundreds of thousands of dollars. Catering to their guests is the top priority.

Hollywood Casino, Columbus Hollywood Casino, Columbus Hollywood Casino, Columbus

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Harrah's Resort Atlantic City Parking Garage Solar Canopies

Caeser Entertainment is committed to renewable and suitable energy. Caeser Entertainment is propelling toward it’s goal of reducing greenhouse emissions by 100% before 2050.

Poultry Farm Bucket Elevator

This massive galvanized bucket elevator system supplies over 350 tons of poultry feed per hour up 198’ trunk sections with a 100 horsepower gear drive. This system operates 24 hours per day, 6 days per week, and longevity of the steel is essential.

Hershey Park

The thrilling new White Cap and Breakers Edge water slides at Hershey Park this year will be like none other in North America. There will be none, higher, faster, or wetter as you go down one slide and seemingly come out the other.

City of Utuado Bridges (After Hurricane Maria)

In September of 2017, Hurricane Maria, a category 5 storm, brought devastation to the island of Puerto Rico. Maria left the country without power and more than 1,100 lives were lost to this catastrophic event.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel