Mayflower II Restoration

The Mayflower II was an aging replica of the Mayflower. The Mayflower II has welcomed 25 million visitors since it arrived in Plymouth in 1957 as a gift from the British for American solidarity and sacrifice during World War II.
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 2 tons | HDG: 2 tons

Components

Various frames and parts including battery stands, electronic equipment fixtures, exterior chains (galvanized and then Painted), chain plates (galvanized and painted), generator stands.

The Mayflower II was an aging replica of the Mayflower. The Mayflower II has welcomed 25 million visitors since it arrived in Plymouth in 1957 as a gift from the British for American solidarity and sacrifice during World War II. The Restoration of the Mayflower II took 3 years and $9 million.

On September 7, 2019 the 63-year-old Mayflower II, a full-scale replica of the ship that brought the Pilgrims across the Atlantic in 1620, will return to the water after a three-year, $9 million restoration at Connecticut’s Mystic Seaport. Next spring, it will make the journey home to Plimoth Plantation in Massachusetts, where it will reopen to the public and be on display for the 400th anniversary of the Pilgrims’ landing. The restoration project began in earnest during two successive winters, beginning in 2014-15 when the Mayflower II was towed to Mystic to assess the damage.

The goal of the restoration was to get another 60 years. With that goal in mind they chose hot dip galvanizing for steel frames and other steel parts in the restoration. Knowing that hot dip galvanizing would give them superior coating durability and corrosion performance they knew this was the best way to protect the steel components used to complete the restoration.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Lake Bridges at Kentucky Lake

This bridge is open to the public for a pedestrian walkway at the Kentucky Lake State Park. There was concern for things like bikes, skateboards, and the harsh winters that come off of the lake in the winter.

Worcester Psychiatric Hospital

In the harsh winters of Massachusetts, corrosion performance and coating durability are very important.

Deed's Point Pedestrian Bridge

The new bridge replaces a structure that rusted from the inside and was shut down a couple of years ago and removed because it was deemed unsafe. The new bridge is expected to last about 75 years ― or about 5 times longer than the structure it replaces, officials said.

Magnum Piering, Inc.

When driving steel piling into the ground, who knows what the steel may come into contact with. Moisture, minerals, acids, rocks, tree roots, the list can go on and on.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel