Maybrook Solar

8-megawatt fixed-tilt solar installation on approximately 45 acres near Poughkeepsie NY engineered to resist 160 mph winds and heavy snow loads.

Date

September 2025

Location

Montgomery, NY
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 35 tons | HDG: 35 tons

Components

73" ground solar screws, rail components

Maybrook 1 & 2 is a fixed-tilt solar system constructed on approximately 45 acres of land just south of Poughkeepsie, NY. This project utilizes the state-of-the-art Titan Duo Fixed-tilt technology system produced by APA Solar Racking. Considering the geographical location of the project, a system was needed that could withstand category 5 hurricane winds of up to 160mph, and snow loads of up to 100 pounds per foot.

Rated at 8 Megawatts, Maybrook 1&2 in Montgomery, NY utilized approx. 35 tons of 73” hot dipped galvanized ground screws as the foundation for the solar racking system. Montgomery is known for harsh weather year-round and rocky terrain, so a solar racking system was needed that could both penetrate the rough soil and perform during the most intense inclement weather. With the lowest part count per MW, the TITAN system offers ease of installation allowing projects to meet tight schedules. From start to finish, the project lasted about 9 months; with finished galvanized screws shipping to the jobsite in January 2025, the system being online in September 2025. A notable benefit is this project has the potential to power 800 homes, which reduces the electricity rates for those consumers.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Stonebridge Great Lakes

Great Lakes Cheese Co.'s $621 million facility required progressive hot-dip galvanizing of 1,400 tons of structural steel including box beams, tubes, and girts, with specialized hole plugging services for oversized tubular members.

One Times Square

Hot-dip galvanizing enabled rapid construction for One Times Square's $500 million transformation, with 220 tons of steel processed in just two days to create the maintenance-free skeleton façade supporting the iconic ball drop building's new museum and viewing deck. This "set it and forget it" approach eliminated costly paint system maintenance while facilitating the historic landmark's evolution into a 12-floor visitor destination.

Amanda Clearcreek ACES

$22 million Amanda-Clearcreek Local Schools District Improvement Project including a 30000 sq ft field house and campus athletic enhancements.

Starboard Bike Racks

The Starboard restaurant's iconic shark-shaped bike racks were restored through hot-dip galvanizing after coastal elements and heavy use degraded their original powder coating. This corrosion-resistant upgrade ensures the popular Dewey Beach landmark's distinctive bike storage will withstand Atlantic coastal conditions for years to come.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel