Lowell Bridge
All of the connecting plates and angles were galvanized. The rest of bridge was blasted and painted, as the structure was too large to galvanize.

Description
The Challenge, The Solution, The Results
All of the connecting plates and angles were galvanized. The rest of bridge was blasted and painted, as the structure was too large to galvanize. The project is located over the Merrimack River and was a fast track turnaround.
We needed to galvanize and have it mass highway inspected all within 24 hours. Tours go under the bridge as it also passes over a canal, so it needed to have a nice visual appearance.
Our Portfolio
Protecting America's Infrastructure One Dip at a Time

Cage Free Chicken Building
Nucor Building Systems and Henning Companies worked together to build a 1350-ton Chicken Layer Facility. The building is state-of-the-art cage free and conventional pullet and layer barns with an inline breaking facility.

Rich Street Bridge
The consulting engineer for the Rich Street Bridge was looking for a coating system that would stand the test of time against high vehicle and pedestrian traffic in busy downtown Columbus.

Penn State Hershey Data Center
This is a Data Center that supports Penn State University. The building is in a rural part of Pennsylvania, where the weather can be very aggressive.

Westfield Montgomery Mall Transit Center
The project started in the early spring of 2016 and they needed a coating they could work with in the cold, or wet weather of the Mid-West. The County has been using galvanized steel on their local bridges and they knew the performance and cost savings it would have.