Deed's Point Pedestrian Bridge

The new bridge replaces a structure that rusted from the inside and was shut down a couple of years ago and removed because it was deemed unsafe. The new bridge is expected to last about 75 years ― or about 5 times longer than the structure it replaces, officials said.
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 288 tons | HDG: 288 tons

Components

Beams, Tube rail, Plates Stringers, Handrail

The new bridge replaces a structure that rusted from the inside and was shut down a couple of years ago and removed because it was deemed unsafe. The new bridge is expected to last about 75 years ― or about 5 times longer than the structure it replaces, officials said. The old bridge was a new kind of product that featured self-weathering steel that was not supposed to rust like it did.

State engineers and other experts only learned that continuous water exposure meant the structure would keep rusting. Continuous water from the fountains in the river got inside the square tubes that held up the bridge, which means it rusted from the inside. The old bridge also was “whitewashed” by constant exposure to the river fountains, the old bridge was green in color but the new one will be silver, which matches the spires around the RiverScape.

The silver paint should not fade in the same way. The new bridge was replaced by galvanized steel and uses beams instead of tubes. The bridge replaces a structure that rusted from the inside and was shut down for over two years, replaced by the specified duplex system for this project due to the coating durability and corrosion performance.

The duplex system has an estimated lifespan of 75 years. They wanted this bridge to stand the test of time against the moisture in the surrounding area and for the community to enjoy for many years to come without worrying about the durability of the coating system. old bridge old bridge new bridge new bridge

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Morgan State University Pedestrian Bridge

The School needed a Maintenance free structural pedestrian bridge that could be erected before the fall semester started. Galvanized Steel was the only coating system they felt would not hinder their schedule.

Purina Nestle Cooper Steel Green Acres

Nestlé Purina’s $550M pet food facility in Batavia, OH—its first new factory since 1975—will create 300 jobs and feature advanced robotics. Cooper Steel and the galvanizer partnered to deliver over 3,500 tons of steel across 150+ truckloads on a fast-track timeline, ensuring on-time delivery for this massive 1.2M sq ft project.

Goodale Street Parking Garage

The new Goodale Parking Garage was installed to meet increased demand for parking near the Convention Center and Short North District. The parking facility was constructed on the side of an old surface lot which accommodated 192 cars.

OSU Wexner Medical Center Inpatient Hospital

OSU Wexner Medical Center's $1.9 billion inpatient hospital tower utilized hot-dip galvanized steel for mechanical floors 7-10, including HVAC louvre support and curtain wall systems housing equipment at the top of Ohio State University's largest capital project in history.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel