Coney Island Yard Cable Bridge

The Coney Island Yard complex is one of the largest transit yards in America, directly serving four main lines of track into and out of New York City. This project is 83 truss units elevating communication and power cables to keep from flooding waters.
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 1500 tons | HDG: 1500 tons

Components

Structural steel beams, angle, channels, steel trusses

The Coney Island Yard complex is one of the largest transit yards in America, directly serving four main lines of track into and out of New York City. This project is 83 truss units elevating communication and power cables to keep from flooding waters. The structural steel cable bridge is used to create new communication and cable bridges at the Coney Island transit yard in Brooklyn, NY.

One of the largest transit yards in the country, the Coney Island Yard can store up to 881 subway cars at one time, consisting of three yards. The complex is also home to car wash, maintenance, and repair facilities, as well as substations, signal towers, and power and communications cables that support operations. The Coney Island Yard is located adjacent to Coney Island Creek.

This became a problem during Superstorm Sandy; the storm surge caused the creek to flood and inundated the yard complex with over 27 million gallons of saltwater and debris. After pumping out water making repairs, and getting trains operable again, it was determined that additional protection against severe storms is necessary. The solution is to construct a cable bridge over the three yards to elevate communication lines and power cables.

This will prevent delayed communication when the water table causes flooding. It was obvious to the MTA that this project will need the best corrosion protection possible. Considering the life-cycle of hot-dip galvanizing on structural steel is superior to other alternatives at a competitive price, it was an easy decision to choose hot-dip galvanizing.

The timeline on this project is also a consideration. With 83 truss units, the work is constantly flowing, and the quick lead time of the galvanizer was valuable to the MTA.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

One Madison

In 2018 SL Green, the property manager of One Madison Ave announced plans to redevelop the property. This required demolishing the 13 stories down to the top of the 9th floor to accommodate the rehab and addition to the building.

Kreider Farms

The corrosion protection of the steel was the main reason for hot-dip galvanizing. The economics and the time that the steel could be finished was probably the most influential selling point to use all galvanized material on this project.

The Spiral - 66 Hudson Boulevard

Located in the Hudson Yards neighborhood, on the west side of Tenth Avenue, between 34th and 35th Streets, is the Bjarke Ingels designed, 65-story, 66 Hudson Boulevard, also known as "The Spiral", and extending Manhattan’s High Line to the skyline.

Carroll Creek Pedestrian Bridge

Galvanized Steel was selected for the corrosion protection. They were concerned with corrosion staining over the years to come onto the stone, brick, and mason work that was to be done for all of the walkways.