American Pride Parking Garage

American Pride Power Equipment located in Zanesville; Ohio had to resolve storage concerns with their outdoor power equipment. American Pride Power Equipment started in 1990 and relocated to their current location in 1999.

Date

Location

Zanesville, OH
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 75 tons | HDG: 75 tons

Components

Beam, Tube & Plate

American Pride Power Equipment located in Zanesville; Ohio had to resolve storage concerns with their outdoor power equipment. American Pride Power Equipment started in 1990 and relocated to their current location in 1999. Within the last 5-10 years their business model grew.

Warehouse space locally was expensive, and an off-site location was not desirable. What to do? Their current location had space restrictions by the city / county to build an enclosed warehouse, but the space restrictions did not involve increasing the height of a storage facility.

So, a 4-story parking garage was designed and built on-site, storing 100 mowers on each level, lower level is enclosed and heated, levels 2-3-4 will have covers over the equipment provided by the manufacturer. The canopy out front was also hot-dip galvanized where the American flag is proudly flown with pride, the flag at the store is 30’ x 60’ and is on a 120’ pole, it matches the largest flag in the state of Ohio. Once the dealership, the architect, Lepi / contractor came up with a finalized design, Precision Welding & Installation was selected as the fabricator for the project.

Timing is always a key keeping scheduling demands moving forward, the galvanizer worked and communicated closely with the fabricator to meet their galvanized needs for the project. The galvanized project will be around for decades providing coating durability, corrosion performance, life-cycle cost which the owner of American Pride said will pay for itself in less than 10 years.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

St. George’s Bridge

St. George's Bridge's 18-month renovation utilized hot-dip galvanized rails and barriers to replace corroded components, with the Army Corps of Engineers selecting galvanizing for longevity in harsh Mid-Atlantic coastal conditions along the C&D Canal.

Friendship Circle- Rooftop Garden & Recreational Space

The Friendship Circle was established in Pittsburghs Jewish Community in 2006. This is an organization for Children with Special Needs.

Marine Mammal Center/New Balance Foundation

Environmental friendliness and sustainability was the number one concern for the engineer of the Marine Mammal Center and New Balance Foundation at New Harbor walk in the historic Boston Harbor.

Purina Nestle Cooper Steel Green Acres

Nestlé Purina’s $550M pet food facility in Batavia, OH—its first new factory since 1975—will create 300 jobs and feature advanced robotics. Cooper Steel and the galvanizer partnered to deliver over 3,500 tons of steel across 150+ truckloads on a fast-track timeline, ensuring on-time delivery for this massive 1.2M sq ft project.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel