Wells Ice Cream

Phase one of a $450 million multi-phase expansion of Wells Enterprises' Dunkirk NY ice cream production facility for Blue Bunny Halo Top and other brands.

Date

December 2025

Location

Dunkirk, NY

Industry

Agriculture
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 135 tons | HDG: 135 tons

Components

Beams, Channel, Stair Stringers, Handrail

Wells Enterprises, Inc. has started a four-phase plan to construct a 350,000-square-foot facility with 11 production lines for its various ice cream products. Wells manufactures four brands of ice cream products, including Blue Bunny, Blue Ribbon Classics, Halo Top, and the original Bomb Pop. A new facility will not only enhance the production of those brands, but it will also allow for unforeseen industry innovation. Wells Enterprises, Inc., has invested nearly $170 million in an expansion of its facilities in the city of Dunkirk, which will total $450 million upon completion. Wells was acquired by Ferrero of Italy in 2022. This project was planned prior to the acquisition and remained necessary for the future of the site. Some of the products already launched at other production sites that will be produced in Dunkirk include Butterfinger, Baby Ruth, and 100 Grand ice cream bars.

Phase one included adding a room full of tanks which will store chocolate to be infused with various ice cream and frozen dairy products. In addition to the tanks, an enormous freezer was added to freeze the product before it sent across the street for distribution. The monstrous freezer requires a monstrous HVAC system. The 135 Ton platform supports the various components needed to achieve this level of chill. Galvanized steel was chosen for its ability to last for generations and withstand the harsh upstate-NY weather conditions.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Jackson Solar

125-megawatt solar farm spanning more than 1400 acres in Jackson County Michigan using approximately 2400 tons of galvanized steel racking.

OSU Wexner Medical Center Inpatient Hospital

OSU Wexner Medical Center's $1.9 billion inpatient hospital tower utilized hot-dip galvanized steel for mechanical floors 7-10, including HVAC louvre support and curtain wall systems housing equipment at the top of Ohio State University's largest capital project in history.

St. George’s Bridge

St. George's Bridge's 18-month renovation utilized hot-dip galvanized rails and barriers to replace corroded components, with the Army Corps of Engineers selecting galvanizing for longevity in harsh Mid-Atlantic coastal conditions along the C&D Canal.

UMB Maintenance Bay

The University of Maryland School of Medicine's Bresler Research Center added a hot-dip galvanized rooftop maintenance bay with overhead crane system for servicing HVAC equipment on the 15-story building.