Walt Whitman Bridge Drainage System

The Delaware River Port Authority was looking to improve water runoff from the bridge. The solution is a unique drainage system comprised of troughs and tanks, which collect the debris at the top of the anchorage and the water continues down the drainage system to the bottom of the anchorage.

Date

Location

Philadelphia, PA
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 22 tons | HDG: 22 tons

Components

22 troughs, 8 tanks

The Delaware River Port Authority was looking to improve water runoff from the bridge. The solution is a unique drainage system comprised of troughs and tanks, which collect the debris at the top of the anchorage and the water continues down the drainage system to the bottom of the anchorage. The Walt Whitman Bridge, a focal point of Philadelphia, was in need of additional water runoff.

The Delaware River Port Authority solved the issue with a drainage system which is hot-dip galvanized for corrosion protection. The solution consists of 22 troughs and 8 tanks. Edward Kurth & Sons, along with the DRPA decided a “gutter system” will reduce water flow on the platform.

The troughs, weighing 600 pounds each, funnel the water in the lower lever where the tanks collect the water into a filtration system. The tanks are up to 10 feet and length and weigh 1,500 pounds on average. They each hold over 300 gallons of water at a time.

The hope is that this new runoff system will diminish delays during extreme rainfalls. Many Pennsylvania and New Jersey residents have been long awaiting this system to help the flow of traffic during rainfall. It was a challenge to galvanize due to the 3/8” walls and the heavy weight of each piece.

The galvanizer and fabricator were concerned about distortion, due to the original design to not allowing enough venting. After consideration, the design was altered, and the product was a success.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

OSU Wexner Medical Center Inpatient Hospital

OSU Wexner Medical Center's $1.9 billion inpatient hospital tower utilized hot-dip galvanized steel for mechanical floors 7-10, including HVAC louvre support and curtain wall systems housing equipment at the top of Ohio State University's largest capital project in history.

Philly Live

Hot-dip galvanizing was selected for the coating durability and initial life-cycle cost. The job cost may be slightly higher initially, but due to the longevity of the coating, this wil cut down on the maintenance and up-keep of the project, therefore lowering the overall costs of the project.

Knoebels Giant Log Flume

Knoebels Amusement Park's popular log flume ride underwent major refurbishment in 2023, with both new manufactured parts and existing components receiving hot-dip galvanizing to combat corrosion from 33 years of exposure to chlorinated water environments. The tight winter timeline ensured the beloved attraction would be ready for eager patrons when warm weather returned.

Detroit Athletic Club

The Detroit Athletic Club, one of the oldest structures in downtown Detroit originally built in 1915 was in need of updating. It was decided more room, event space, and a aerial view of sporting events in Detroit was what they had been needing and wanting.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel