Pyrmont Road Bridge Rehab

Built in 1904, this bridge is a beautiful nine-panel pin-connected Camelback truss bridge. Pin-connected Camelback truss bridges are uncommon, far less common than Parker trusses of their time.

Date

Location

Lewisburg, OH
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 77 tons | HDG: 77 tons

Components

Complete bridge truss components including beams, flat bars, angle, channels

Built in 1904, this bridge is a beautiful nine-panel pin-connected Camelback truss bridge. Pin-connected Camelback truss bridges are uncommon, far less common than Parker trusses of their time. This bridge is rare, significant, and worthy of rehabilitation in order to be preserved for generations to come.

This historic truss bridge was in much need of repair after servicing the local community for nearly 120 years. Preble County had previous experience with rehabilitating bridges, but this bridge was the largest project to date. The county partnered with both the fabricator and the galvanizer to come up with a plan for removing the bridge, repairing the structurally deficient areas, removing the hundreds of years of paint, galvanizing the steel and re-erecting the bridge.

The galvanizing process had it challenges as the fabricator and galvanizer did not want to damage the structure itself from potential distortion. The team came up with a temporary bracing system that allowed for the main members to support one another back to back during the dipping process. The plan was a success and the bridge came out of the galvanizing process with no damage.

Immediately, all involved knew this was a different kind of project, as the steel still was marked with the emblem of Carnegie Steel Company, Pittsburgh, PA. The residents of Preble will now be able to share this bridge masterpiece and piece of history for years to come thanks to the durability and corrosion protection of hot-dip galvanizing. In August 2020, the bridge was awarded the prestigious Historic Bridge of the Year Award by the Ohio Department of Transportation and the Federal Highway Administration. before galv after galv before galv after galv during galv with bracing Carnegie Steel raising out of kettle

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Northside Transit Center

The Northside Transit Center is the culmination of many years of effort to improve the public transportation infrastructure in the Northside community. Metro broke ground on the transit facility at the end of October 2019, and just less than a year later, bus service began.

Amanda Clearcreek ACES

$22 million Amanda-Clearcreek Local Schools District Improvement Project including a 30000 sq ft field house and campus athletic enhancements.

Magnum Piering, Inc.

When driving steel piling into the ground, who knows what the steel may come into contact with. Moisture, minerals, acids, rocks, tree roots, the list can go on and on.

Indian Mill Bridge Rehab

This single lane vehicular steel truss bridge allows access to the Indian Mill originally built in 1861. The mill was gift to the Wyandot Indian Nation from the US Government as a reward for their aid during the War of 1812.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel