Polar Hill Services for the National Science Foundation

Relocatable building system deployed at a National Science Foundation research facility on the Greenland ice sheet at 10600 feet elevation.

Date

Location

Summit Station, Greenland
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 5 tons | HDG: 5 tons

Components

Tubes and tube frames

A 32 ft x 97 ft BVR-type fabric structure engineered specifically for polar use was deployed at Summit Station, a remote NSF research facility on the Greenland ice sheet. Located at approximately 72 degrees north latitude and over 10,600 feet above sea level, Summit Station experiences extreme cold with winter lows reaching nearly -100°F. The structure features Thermohall® insulated PVC cladding with an insulation value of R-35. Installed on a sled-style wood and steel foundation, the building was successfully relocated approximately 400 yards across the ice to avoid snow burial. All components were transported via U.S. Air Force C-130 aircraft equipped with skis and assembled by a team living in polar tents.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Solar Reel Trailer

Utility-scale solar construction trailer designed to transport and deploy large reels of electrical cable across expansive project sites.

Owosso Speedway

Complete transformation of the historic Owosso Speedway founded in 1937 including refurbishing and re-galvanizing over 150 tons of structural steel.

Holy Spirit High School

21-foot structural steel archway entrance for Holy Spirit High School's athletic complex featuring a duplex galvanize-and-paint finish for coastal New Jersey.

Bedford High School

Bedford High School's "Kicking Mule" mascot statue was crafted from over 750 recycled horseshoes donated by the local Amish community and hot-dip galvanized to ensure long-lasting durability at the football stadium entrance. This 715-pound community project was completed through donated materials and services for the 2024 homecoming celebration.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel