Johns Hopkins Hospital Cooling Tower

The North Plant at Johns Hopkins Medical Campus resides adjacent to the Science + Technology Park, which occupies 88 acres of downtown Baltimore used for medical schooling, doctors’ offices, laboratories, office space, and retail space.

Date

Location

Baltimore, MD
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 400 tons | HDG: 400 tons

Components

structural steel (Beams, channels, angle), and staircase and handrail

The North Plant at Johns Hopkins Medical Campus resides adjacent to the Science + Technology Park, which occupies 88 acres of downtown Baltimore used for medical schooling, doctors’ offices, laboratories, office space, and retail space. The North Plant is converted from a coal plant aging close to 100 years. The transformation took place for Johns Hopkins Medical Campus in the 1960’s.

Since then, the building has been under steady renovation, keeping up with the everchanging technical setting. Since Johns Hopkins took over the retired coal plant, the building has constantly been upgraded and remodeled. Recently, the cooling towers on the roof were in need of replacement.

The cooling tower is in four phases, which allowed the campus to maintain proper temperature while under construction. The construction included over 400 tons of galvanized steel. Much of the 400 tons was structural, but stairs and handrail were also included.

The four phases were completed in roughly 18 months. The fabricator and general contractor stated that hot-dip galvanizing was not the original specified coating, and instead the coating was to be a paint system. They advised against paint, due to the coating durability and life-cycle cost that hot-dip galvanizing offers, and have been happy with the outcome of the erected galvanized structure.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Detroit Athletic Club

The Detroit Athletic Club, one of the oldest structures in downtown Detroit originally built in 1915 was in need of updating. It was decided more room, event space, and a aerial view of sporting events in Detroit was what they had been needing and wanting.

Ponte Lenzino Temporary Bridge

Near the small town of Bobbio, Ponte Lenzino carries traffic over the Trebbia River on national roadway S.S.45.

Godwin Mercado

Flexible indoor/outdoor pavilion marketplace transforming a former GM site in Wyoming MI into a community gathering space.

Cage Free Chicken Building

Nucor Building Systems and Henning Companies worked together to build a 1350-ton Chicken Layer Facility. The building is state-of-the-art cage free and conventional pullet and layer barns with an inline breaking facility.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel