I-480 Valley View Bridge Catwalk

The $228 million I-480 Valley View Bridge / Design-Build is the largest active project in the State of Ohio and the 4th largest in ODOT history. ODOT engineers came up with a plan to turn 2 bridges into 3 bridges.

Date

Location

Cleveland, OH
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 1500 tons | HDG: 1500 tons

Components

Catwalks made of channel Frames, Grating & Handrail

The $228 million I-480 Valley View Bridge / Design-Build is the largest active project in the State of Ohio and the 4th largest in ODOT history. ODOT engineers came up with a plan to turn 2 bridges into 3 bridges. The I-480 bridge project benefits the 180,000 vehicles who utilize bridges daily.

The Walsh Design team along with ODOT designed and constructed a new 4,150-foot center 4-lane bridge in the median space between the existing eastbound and westbound bridges which helped eliminate traffic congestion. The new bridge required a catwalk to be deigned, fabricated and installed under it in order to allow for inspection over the years to come. The hot-dip galvanizing itself began in 2019 as the galvanizer and fabricator worked side by side to accomplish this large project in Independence (Cleveland), Ohio.

One of the key components that the galvanizer brought to the table besides quality galvanizing, customer satisfaction, on-time delivery was the ability to layout and assemble 24,000 LF of new catwalk over the three-year period at their facility. Normally it would take one-two days per truckload for the team to assemble the multiple grating sizes to the frames for the 30 truckloads per year. Communication was a big key by our inside sales team to the success of his project: daily, weekly calls regarding assembly, shipping details and handling of the multiple truckloads of material delivered to the jobsite.

The 24,000 LF of catwalk was added on the new bridge as well as the renovated bridges. Having a galvanized structure will allow for passengers to have safe commutes for years to come without worrying about the durability to the coating system.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

West Ottawa Football Stadium

The new stadium complex is located near the West Ottawa High School North campus and provides an intimate athletics spectator experience with the capability to host multiple events simultaneously. As part of a $97.

The Rastin Observation Tower

Mount Vernon is the county seat of Knox County, located in North Central Ohio, and is home to the brand new Ariel-Foundation Park, a 250-acre public green space built on the site of the former Pittsburgh Plate Glass (PPG) manufacturing plant (which closed in the 1970s).

Oklahoma State Boone Pickens Stadium Renovation Phase 2

Oklahoma State University's $55 million Boone Pickens Stadium renovation utilized 1,800 linear feet of hot-dip galvanized handrails with specialized thread protection services and rapid 48-hour turnarounds to enhance fan safety and experience.

Philly Live

Hot-dip galvanizing was selected for the coating durability and initial life-cycle cost. The job cost may be slightly higher initially, but due to the longevity of the coating, this wil cut down on the maintenance and up-keep of the project, therefore lowering the overall costs of the project.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel