I-480 Valley View Bridge Catwalk

The $228 million I-480 Valley View Bridge / Design-Build is the largest active project in the State of Ohio and the 4th largest in ODOT history. ODOT engineers came up with a plan to turn 2 bridges into 3 bridges.

Date

Location

Cleveland, OH
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 1500 tons | HDG: 1500 tons

Components

Catwalks made of channel Frames, Grating & Handrail

The $228 million I-480 Valley View Bridge / Design-Build is the largest active project in the State of Ohio and the 4th largest in ODOT history. ODOT engineers came up with a plan to turn 2 bridges into 3 bridges. The I-480 bridge project benefits the 180,000 vehicles who utilize bridges daily.

The Walsh Design team along with ODOT designed and constructed a new 4,150-foot center 4-lane bridge in the median space between the existing eastbound and westbound bridges which helped eliminate traffic congestion. The new bridge required a catwalk to be deigned, fabricated and installed under it in order to allow for inspection over the years to come. The hot-dip galvanizing itself began in 2019 as the galvanizer and fabricator worked side by side to accomplish this large project in Independence (Cleveland), Ohio.

One of the key components that the galvanizer brought to the table besides quality galvanizing, customer satisfaction, on-time delivery was the ability to layout and assemble 24,000 LF of new catwalk over the three-year period at their facility. Normally it would take one-two days per truckload for the team to assemble the multiple grating sizes to the frames for the 30 truckloads per year. Communication was a big key by our inside sales team to the success of his project: daily, weekly calls regarding assembly, shipping details and handling of the multiple truckloads of material delivered to the jobsite.

The 24,000 LF of catwalk was added on the new bridge as well as the renovated bridges. Having a galvanized structure will allow for passengers to have safe commutes for years to come without worrying about the durability to the coating system.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Capitol Square Planters

The goal of the Capital Crossroads Special Improvement District was to beautify the area surrounding Ohios State Capitol Square. In conjunction with the City of Columbus and a local artist, this has been done with the addition of these 72 planters.

Tool Mama

Where this sculpture is sitting the following is inscribed as the description: "Tool Ma Ma 2017" Tools from Heart of Ohio Antique Mall Formed & Welded over mannequin from Craig's List.

ProSeries Mast Climber

Premier Scaffold Solutions reinvented the mobile scaffold industry in 2009 with their ProSeries Mast Climber. The ProSeries Mast climber makes it easier to replace aging mast climbers, because of its modular bridging being compatible with other mast climbers on the market.

Mirror Lake at The Ohio State University

Mirror Lake at The Ohio State University was the home to long storied tradition of students jumping into the lake in order to celebrate the beginning of the week of the school’s rivalry football game with The Team Up North (aka University of Michigan).

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel