Himalayan Kedarnath Temple Pilgrimage Bridge

The previous Bridge was washed out by flooding, in 2013. This resulted in over 5700 people dead or missing.

Date

Location

Sonprayag, India
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 110 tons | HDG: 110 tons

Components

All Panel chords, diagonals, verticals, raker & reinforcing chords, structural beam members and flooring

The previous Bridge was washed out by flooding, in 2013. This resulted in over 5700 people dead or missing. The recovery from this natural disaster took over 2 years.

The Kedarnath Temple (AKA Lord Shiva's Temple), is a very important part of the Hindu culture and religion. Hundreds of thousands of Hindu Pilgrims from all over the world take the trek to this Temple each year. The Temple is 3500 feet above sea level and the previous year the journey was over 35 kilometers and proved to be too much.

With equipment needed and the challenging topography it would take more than 3 years to build a typical approved bridge and impossible to paint or maintain. The galvanized bridge was shipped in containers from the USA and completed in an incredible 45 days. Within weeks more than 500,000 pilgrims reduced their trek to 14 kilometers at a manageable 2600 feet above sea level.

Galvanizing in this remote part of the world is not easily available. When they found they could get the bridge not only fast but also galvanized that was the deciding factor.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Himalayan Kedarnath Temple Pilgrimage Bridge

The previous Bridge was washed out by flooding, in 2013. This resulted in over 5700 people dead or missing.

LWL Trailers

Established in 1968, Linkletter’s Welding began building quality trailers that are designed for long life, hard use, and low maintenance. Being a Canadian manufacturer, Linkletter’s Welding can supply their products across North America.

One Times Square

Hot-dip galvanizing enabled rapid construction for One Times Square's $500 million transformation, with 220 tons of steel processed in just two days to create the maintenance-free skeleton façade supporting the iconic ball drop building's new museum and viewing deck. This "set it and forget it" approach eliminated costly paint system maintenance while facilitating the historic landmark's evolution into a 12-floor visitor destination.

Route 434 Greenway

A 2.5 mile bicycle and pedestrian path built to provide a safe walking link between the Binghamton University Campus and downtown. For many years along 2.5 traffic laden miles of Route 434 roadway, pedestrians have been pushed to the side of the road.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel