Godwin Mercado

Flexible indoor/outdoor pavilion marketplace transforming a former GM site in Wyoming MI into a community gathering space.

Date

Location

Wyoming, MI
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 50 tons | HDG: 50 tons

Components

Columns, Trusses, Roof Framing

Fabricated from 50 tons of structural steel, this open and airy pavilion provides a much needed community space. Hot-dip galvanizing was chosen to protect the exposed steel columns, trusses, and roof framing from Michigan’s harsh seasonal elements. The use of galvanizing ensures long-term structural integrity, making it a cost-effective and low-maintenance solution for a highly trafficked public venue.

With clean architectural lines and weather-resistant framing, the structure blends modern function with community-focused design. The marketplace stands as a symbol of resilience and reinvestment, and hot-dip galvanizing played a crucial role in making that possible.

The 36th Street Marketplace- also known as the Godwin Mercado- is a transformative civic investment by the City of Wyoming, breathing new life into the former GM site along the 36th Street corridor. Conceived as a flexible indoor/outdoor pavilion, the marketplace provides space for cultural events, food trucks, farmers' markets, and local vendors throughout the year. More than a gathering place, it represents economic renewal, community identity, and the continued revitalization of a once-industrial property now repurposed for public benefit.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Connesville Bridge

Crawford Avenue Bridge's $11.5 million rehabilitation project replaced the 65-year-old structure with a 490-foot, six-span steel stringer bridge featuring hot-dip galvanized girders, cross frames, and splice plates for corrosion protection near the Youghiogheny River. The new design includes expanded vehicle capacity, a seven-foot bike lane, and six-foot sidewalk for enhanced pedestrian and bicycle safety.

Beaver Stadium

Multi-phase renovation of Beaver Stadium at Penn State University completed in time for the 2025 football season.

Knoebels Giant Log Flume

Knoebels Amusement Park's popular log flume ride underwent major refurbishment in 2023, with both new manufactured parts and existing components receiving hot-dip galvanizing to combat corrosion from 33 years of exposure to chlorinated water environments. The tight winter timeline ensured the beloved attraction would be ready for eager patrons when warm weather returned.

Farmingdale High School Carport

Farmingdale High School's 946.7KWDC solar carport system utilized 72 tons of hot-dip galvanized steel including anchor bolts, columns, tube arms, and purlins, with 24-hour turnaround schedules enabling seamless installation without blocking parking spaces.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel