General Douglas MacArthur High School

Three solar canopies over school parking lots with 400 solar modules producing a 575.25kW DC system.

Date

September 2025

Location

Levittown, NY
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 45 tons | HDG: 45 tons

Components

Columns, Purlins

To take advantage of its parking lots, General Douglas MacArthur High School has launched a green energy project that will greatly reduce its energy costs. The project, better known as an Energy Performance Contract (EPC), calls for the construction of solar carports solar panels as well as lighting upgrades. The solar canopies will be the most visible part of the upgrades. They will produce electricity for receiving a 575.25kW DC system that will partially offset General Douglas MacArthur High School’s electric bill. The school will also see interior and exterior lights replaced with state-of-the-art LED lights and fixtures that are significantly more efficient than the current lighting units that are in areas comprised of decades old technology.

General Douglas MacArthur High School is participating in an energy performance project that just installed three solar canopies throughout the school’s parking lot. With 400 solar modules and energy performance, the canopies are equipped with 2 charging stations for electric cars.

These solar canopies are constructed from 45 tons of hot dip galvanized Steel Columns and Purlins. The heavy W27x68 x 15 ’tall columns and 38’-53’ long purlins created longer spans to use as few parking spaces as possible. Each Canopy is turned around with a truck load of steel every 24-48 hours for a seamless installation for Tebbens Steel.

“This installation will showcase the district’s commitment to pioneering the use of renewable clean energy within the facility and set a lead example for other districts throughout Long Island.”

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

EV Battery Plant

LG Energy Solution and Honda's $4.4 billion joint venture EV battery plant in Jeffersonville, Ohio required over 1,000 tons of hot-dip galvanized steel across 2 million square feet, with 24-48 hour turnaround times to meet daily delivery schedules for this massive facility creating 2,200 jobs.

Jackson Solar

125-megawatt solar farm spanning more than 1400 acres in Jackson County Michigan using approximately 2400 tons of galvanized steel racking.

JPMorgan Chase 270 Park Ave

JPMorgan Chase's 60-story, 2.5 million square foot headquarters at 270 Park Avenue utilized 1,500 tons of hot-dip galvanized steel for upper floors to combat corrosive conditions from heat and moisture generated by electrical equipment. This $3 billion supertall structure is the tallest building in New York completely powered by hydroelectric energy.

Pennsylvania Turnpike Road Tolling

Pennsylvania Turnpike's Open Road Tolling system features hot-dip galvanized gantries with duplex coating systems that support cashless, free-flowing toll collection estimated to save over $25 million annually. This corrosion-resistant infrastructure enables efficient traffic flow while reducing emissions and fuel consumption for the 86% of customers using PA EZ-Pass.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel