General Douglas MacArthur High School

Three solar canopies over school parking lots with 400 solar modules producing a 575.25kW DC system.

Date

September 2025

Location

Levittown, NY
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 45 tons | HDG: 45 tons

Components

Columns, Purlins

To take advantage of its parking lots, General Douglas MacArthur High School has launched a green energy project that will greatly reduce its energy costs. The project, better known as an Energy Performance Contract (EPC), calls for the construction of solar carports solar panels as well as lighting upgrades. The solar canopies will be the most visible part of the upgrades. They will produce electricity for receiving a 575.25kW DC system that will partially offset General Douglas MacArthur High School’s electric bill. The school will also see interior and exterior lights replaced with state-of-the-art LED lights and fixtures that are significantly more efficient than the current lighting units that are in areas comprised of decades old technology.

General Douglas MacArthur High School is participating in an energy performance project that just installed three solar canopies throughout the school’s parking lot. With 400 solar modules and energy performance, the canopies are equipped with 2 charging stations for electric cars.

These solar canopies are constructed from 45 tons of hot dip galvanized Steel Columns and Purlins. The heavy W27x68 x 15 ’tall columns and 38’-53’ long purlins created longer spans to use as few parking spaces as possible. Each Canopy is turned around with a truck load of steel every 24-48 hours for a seamless installation for Tebbens Steel.

“This installation will showcase the district’s commitment to pioneering the use of renewable clean energy within the facility and set a lead example for other districts throughout Long Island.”

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Liberty Place Parking Garage

The developer of the new Liberty Place Apartments in the heart of Columbus, Ohios Brewery district was seeking an economical, long lasting solution for the parking problem surrounding their project.

Surf Rake

Jones Beach, NY needed a tough, durable beach comb that would not be abraded by the constant wearing of wet sand and corrosive sea water. They decided to hot-dip galvanize their surf rakes in order to ensure the tools would withstand the corrosive beach environment.

Johns Hopkins Hospital Cooling Tower

The North Plant at Johns Hopkins Medical Campus resides adjacent to the Science + Technology Park, which occupies 88 acres of downtown Baltimore used for medical schooling, doctors’ offices, laboratories, office space, and retail space.

Chicago Ave. Bridge

U.S. Bridge’s mission is to connect communities one steel bridge at a time.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel