Frankenmuth Gateway Arch

This is a Highway Sign welcoming visitor to the popular city of Frankenmuth, Michigan where it is Christmas year round. This highway sign started to be an archway over the freeway.

Date

Location

Frankenmuth, MI
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 42 tons | HDG: 42 tons

Components

Entire arch, including ornaments, diaphragms, connector plates, and anchor rods.

This is a Highway Sign welcoming visitor to the popular city of Frankenmuth, Michigan where it is Christmas year round. This highway sign started to be an archway over the freeway. Once the Architect and the City got involved this became quite an advertisement for this popular tourist spot in Michigan.

This was a very difficult piece to design, and install as galvanizing was speculated to be impossible. The State realized the cost of having to maintain this structure in the future. This was very difficult section and multiple progressive dips and weekends were involved to achieve success for such a challenging but worthwhile project.

They liked the longevity promised to them with the Duplex System of HDG and an Epoxy/Urethane top coating of paint. They were also very happy with the economical savings of a Galvanized based Duplex System as compared to having to blast and try to coat a inorganic zinc, epoxy, urethane, paint system. The size also limited who could dip this piece but really there were no paint facilities large enough to correctly blast and paint the arches with MDOT approval, as did the Galvanizer that was selected.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Jordan River National Fish Hatchery – Recirculating Aquaculture System (RAS)

Jordan River National Fish Hatchery has produced native fishes for stocking into the Great Lakes since 1965.

Fashion District Ad Boards

Yesco has been responsible for building signs all over the world. Yesco became a true leader in the sign industry when they installed the first neon sign.

Hunter Truck Lift

Hunter’s Heavy-Duty Four-Post semi and truck lift features a 35,000-lb. lifting capacity and 300-in. alignment wheelbase capability. The hot-dip galvanized runways offer the best in corrosion protection for your investment.

Fourteen Mile Bridge

The West Virginia Division of Highways announced that it is using a new type of technology to replace a bridge in Lincoln County.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel