Fifth Third LED Board

Cincinnati Center City Development Corporation (3CDC) purchased a new state-of-the-art LED video board from Cincinnati based LSI Industries. The new display will provide better viewing angles and crisper image quality similar in size that it is replacing.

Date

Location

Cincinnati, OH
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 15 tons | HDG: 15 tons

Components

Video Board support structural steel, Beam, Tubes, Angle, Plates

Cincinnati Center City Development Corporation (3CDC) purchased a new state-of-the-art LED video board from Cincinnati based LSI Industries. The new display will provide better viewing angles and crisper image quality similar in size that it is replacing. The new video board is full color, 52 feet wide and 23 feet high, with high-definition LED and cost $1 million dollars. “Fountain Square” is thought of as Cincinnati’s heartbeat, main gathering place promoting regional attractions and often used to televise Cincinnati sporting events.

Fifth Third Bank sponsors 3CDC’s programming on Fountain Square year-round and constructed and donated a $2 million permanent stage to host concerts, contests and more, Fifth Third Bank considers Fountain Square as our front porch. The new LED video board is Fifth Third’s connection and commitment to their hometown. The structure consisted of one large beam at the base, with tube, angle and plates.

Galvanized steel was the preferred coating based on durability, corrosion performance and sustainability. Fabricator worked closely with the galvanizer to keep up with the scheduling demands of the project. George Steel then coordinated the two week installation of the video board through Neiheisel Steel out of Cincinnati to erect the structure prior to the Cincinnati Red’s baseball Opening Day on April 1st, great teamwork throughout the project made this a big hit.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Pier 15

This project was right on the river in a harsh environment and galvanizing was the perfect fit for both visual and coating. Turnaround time was very important, and the galvanizer turned this project around in 48 hours per truckload.

Graphic Packaging Mill

Atlanta based Graphic Packaging Holding Company, a leading provider of packaging solutions to food, beverage, food service, and other products companies completed a $600 million, 350,000 SF expansion project in Kalamazoo, Michigan.

XPO Logistics Trailers

XPO Logistics has the ability to produce reliable results across 50 states and 99% of all US postal codes.

Zadra Roller Coaster

Zadra Roller Coaster opened on August 22, 2019 at Energylandia, located in Zator, Poland. Zadra is polish for “Splinter”, which speaks to its hybrid characteristic of being constructed of both steel and wood.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel