Davidson County Airport Runway Gantry

A new approach lighting system was installed at the Davidson County Airport will be a first of its kind in North Carolina, crossing a major interstate.

Date

Location

Lexington, NC
Description

The Challenge, The Solution, The Results

Customer

Awards

Project Size

Steel: 150 tons | HDG: 150 tons

Components

Wide-Flanged Beams, Angle, Channel, Bar & Misc. Metals

A new approach lighting system was installed at the Davidson County Airport will be a first of its kind in North Carolina, crossing a major interstate. The airport constructed an approach lighting system that extends along the runway centerline off the southernmost end of Runway 6-24 and will cross Interstate 85. This system will include seven seven light towers inside the interstate right-of-way and two two light towers directly over travel lanes.

The towers will feature horizontal bars of lights at the top that will make the approach to the runway more visible, especially in poor weather conditions that limit visibility. These towers will need to stand the test of time while in the pathway of both airplanes and automobiles. There is no time for downtime when it comes to structural steel holding up lighting responsible for landing airplanes.

Maintaining this steel structure that is suspended over an interstate does not allow for access either. It became clear that there is only one option for eliminating maintenance and protecting this structure for decades to come, hot-dip galvanizing. The gantry system was fabricated, galvanized and assembled in the shop prior to being shipped all the way from New York State to its home in North Carolina.

This required a small window of opportunity for the galvanizing process itself. Thanks to a carefully coordinated schedule and quick turnaround at the galvanizing plant, the contractors were able to pull this project off successfully. No other coating would have met the demanding timelines and provided the ultimate in maintenance free corrosion protection.

Gallery

Every Detail Tells Our Story

Dive deeper into this project with exclusive images that capture the craftsmanship, precision, and galvanizing expertise that brought this vision to life.

No items found.
Our Portfolio

Protecting America's Infrastructure One Dip at a Time

Pier 15

This project was right on the river in a harsh environment and galvanizing was the perfect fit for both visual and coating. Turnaround time was very important, and the galvanizer turned this project around in 48 hours per truckload.

Bri-Mar Utility Trailers

For many years, Bri-Mar was manufacturing and coating their utility trailers in house. They were using a painted system, but were having continual issues with performance, paint matching, and maintaining their paint line.

Castleton Bridge Rehabilitation

The Castleton Bridge, which opened in 1958 and runs about one mile in length, connects the Berkshire Spur section to the Thruway's mainline. About 17,000 vehicles per day, travel across the recently rehabilitated bridge that connects Albany and Rensselaer counties over the Hudson River.

McRae Ave. Garage Solar Panels

AdventHealth’s solar array represents the largest on-site solar project for a health care organization in Central Florida, and is the largest solar project within Orlando city limits.

Ready to Transform Your Project with Industry-Leading Galvanizing?

Don't let corrosion compromise your investment. Partner with V&S Galvanizing for proven protection that outlasts the competition. Our expert team delivers custom solutions, rapid turnaround, and nationwide reliability that keeps your project on schedule and on budget.

Hot dip galvanizing steel